National Assembly Headquarter

National Assembly Headquarter Free 3D model

Description

This model was based on a building located in Angola/Luanda and serves has the National Assembly Headquarter. The building inaugurated on 9 November 2015 was initiated on 15 October 2009, while the construction started on 17 May 2010. It is a part of the Political Administrative Centre covering an area of 72,000 Sq.m and a built area of 54,000 sq.m. The Centre accommodates Presidential Palace, the Palace of Justice, the Defence Ministry, Ministry of Justice and Human Rights, the Episcopal Palace and the premises of the former National Assembly headquarters.

The model has been rendered in cycles using blender 2.9 version. All the parts of the model can be easily separated since each piece was built individually making it possible to be attached to another project of your choice or making changes to fit your needs.

Vizcatz
Vizcatz 2022-06-07 06:36:49 UTC
The file are empty.
Item rating
0 0
National Assembly Headquarter
Free
 
Royalty Free No Ai License 
National Assembly Headquarter
Free
 
Royalty Free No Ai License 
Response 60% in 6.0h
3D Modeling
Low-poly Modeling
Hire me

3D Model formats

Format limitations
Native
  • Blender 2.9 (.blend)95.6 MBVersion: 2.9Renderer: Cycles 2.9
Exchange
  • OBJ (.obj, .mtl)193 MB
  • Autodesk FBX (.fbx)296 MB

3D Model details

  • Publish date2020-11-24
  • Model ID#2722609
  • Animated
  • Rigged
  • VR / AR / Low-poly
  • PBR
  • Geometry Polygon mesh
  • Polygons 5,875,817
  • Vertices 7,760,549
  • Textures
  • Materials
  • UV Mapping
  • Unwrapped UVs Unknown
  • Plugins used
  • Ready for 3D Printing
Help
Chat