Construction of a Berth and Pontoon. Stages of construction of a mooring wall/ berth and pontoon. The model contains an animation of the construction of the mooring wall and the appearance of pontoons. The process includes: installation of piles, pouring of piles with concrete, anchor ties, 2 types of filling, concrete slabs for wires, upper plates, slope, fastening of three sections of the pontoon, the appearance of anchors and the appearance of tugs.
Archive includes files with the extensions .fbx, .obj, dwg and material library. Viewing and working with animation is performed in the 3dmax file (fbx, obj, dwg files are not animated). Number of polygons: 740 982. Quantity of vertex: 402 764. Version of the program: 3ds max 2018. Type of render: CoronaRender.